needsaparrot: (construction)
needsaparrot ([personal profile] needsaparrot) wrote in [community profile] fandomhigh2007-08-08 10:25 am
Entry tags:

Construction: Wednesday August 8th, all day

There's a roof, yes. What there isn't -- or at least what's chugging along in the basement trying to start, and hasn't reached most of the areas still under construction -- is air conditioning.

Yeah.

"Your mission, should you choose to accept it, and I think you will, is to go through all the floors and get the AC ducts open," Xander tells the graduate workers. "The sooner it's done, the sooner you don't have to actually swim through the halls. At least until the next flood."
_
[OOC: Open!]

Re: Morning

[identity profile] big-head-boy.livejournal.com 2007-08-08 06:07 pm (UTC)(link)
Crawling through ducts? That's what Dibs do best! (Other than screaming in fear.) Dib skipped the easy way and kept to the ducts. It was faster for him that way.

Re: Morning

[identity profile] big-head-boy.livejournal.com 2007-08-08 07:42 pm (UTC)(link)
At other things, Dib might be quite the nuisance. But ducts had been the best way to get around Zim's base without being noticed, and so Dib had a lot of experience in them. He was very quiet, and aside from the odd sounds of muttering to himself and opening closed sections, Dib didn't make a sound.
demonbelthazor: (Bel is determined)

Re: Morning

[personal profile] demonbelthazor 2007-08-08 07:37 pm (UTC)(link)
Bel grumbled a little. He'd rather be doing some physically intensive work to get some of his rage out, but he'd make do.